Thursday, October 11, 2012

4th International Conference on Estuaries and Coasts (ICEC 2012)

4th International Conference on Estuaries and Coasts, 8 - 11 October 2012, Hanoi, Vietnam

The 4th International Conference on Estuaries and Coasts (ICEC 2012) was co-organised by Water Resources University (WRU) of Hanoi, Vietnam and the International Research and Training Center on Erosion and Sedimentation (IRTCES). It was the subsequent conference following the 1st ICEC 2003 (Hangshou, China), 2nd ICEC 2006 (Guangzhou, China) and the 3rd ICEC 2009 (Sendai, Japan).

Bringing together researchers and engineers working in estuaries and coasts, this ICEC 2012 has around 150 participants, more than half of them come from abroad (Japan, Brazil, Netherlands, Italy, China, Sweden, Korea, France, Indonesia, Belgium, Singapore, USA etc…). The conference serves as a platform for presenting research results, exchanging information, facilitating networking, and promoting advanced technologies related to estuarine and coastal development. Within two days of 9-10 October, 9 keynote lectures were presented at the lecture hall and about 100 presentations of 4 parallel sessions were presented at 4 technical rooms. The presentations covered 9 main thematic topics:

- Coastal and estuarine hydrodynamics
- Environmental and ecological hydraulics
- Coastal structures
- Estuarine and coastal management
- Water resources and hydrology
- Research technologies for estuaries engineering
- Coastal hazards
- Climate change

In parallel with the presentation, some companies such as of Dynamic Solutions International (DSI), Nikken Kogaku Co. Ltd and Vietnam Hydraulic Engineering Consultants Corporation JSC also had their exhibition stalls, showing their products and technologies in coastal engineering.

The technical program is attached at the end of this note (actual program was slightly different because of alternating keynote speakers). Full program included a technical tour to Hai Phong, visiting Dinh Vu reclaimation project, Nam Trieu estuary and Dike No. 1 in Do Son on the last day of October 11, 2012 (I did not attend the technical tour).

For more detail information on each thematic topic and its papers, you can find at these links below on Dropbox:
At the closing ceremony, call for papers of the 5th ICEC November 2-4, 2015 in Oman (Middle East) was officially announced. The next ICEC 2015 themes include coastal erosion, seawater quality, Tsunami, integrated coastal zone management, seawater intrusion, social, economic and political problems involving coasts and estuaries. For conference info and online submission, see the ICEC conference website at http://www.icec2015.org.

Call for papers of the 19th Congress of the Asia & Pacific Division of the International Association for Hydro – Environment Engineering & Research (IAHR-APD), September 21 – 24, 2014 at Water Resource University, Hanoi, Vietnam was also announced. The congress main theme of “working globally on water and climate change issues but acting locally” includes subthemes such as sustainable water resources and climate change, estuarine and coastal hydraulics, hydraulic structures and environmental hydraulics. For online submission, see the congress website at: http://www.iahr-adp2014.wru.edu.vn.

*****

 

Some notes of the discussion on our presentation




Our presentation on “Bamboo breakwater - site-specific erosion protection and adaptation to climate change in Soc Trang Province, Vietnam” received quite positive feedback. People enjoyed the time-lapse movie. Some participants said that they were impressed with the low cost of the measure. Some participants wish to visit Soc Trang someday to see the construction. One professor said that the topic is very interesting, very “Vietnam” (with bamboo), that the paper should be published and it even can be developed into a PhD thesis.

There was one question about working with local authorities/management, how to integrate and realise the research results into application in reality. I explained that our project cooperates closely with local partners such as PPC, DARD, therefore we did receive approval from them in implementation of the construction.

On the other hand, there were questions/doubts about the durability of bamboo breakwater under stormy conditions as well as longevity of the constructions in general. I explained that it is the sound installation of bamboo poles embedded underneath the soft mud, together with their sufficient size that assure the strength of the bamboo structure (which were confirmed by tension tests). Moreover, if sediment can be developed and mangroves can be rehabilitated after sometime (maybe 1 – 3 years?, we don’t know), then the breakwater would complete its mission. One participant contributed that because the waves are not so high and intense in Mekong Delta, compared to other regions in Vietnam, therefore, using bamboo here should be fine.

There was one comment about the stagnancy of water behind the T-fences that may lead to bad water quality in the area. I explained that there were gaps/spaces between the long-shore parts of the Ts where water can flow, thus, it should not be a problem.

Another concern was about the dynamic process of accretion and erosion and how we could be sure that our interference did not create erosion somewhere else. I explained that I did mention in the presentation, the construction was designed based on scientific understanding of the natural processes (with numerical modeling, field measurement, using existing data). Moreover, by recreating the former coastline, the “close to nature” conditions were made which help minimize downdrift erosion.
There were a comment that our construction seems to be more like groins than breakwater and a recommendation that we should combine bamboo with some hard (concrete/stone) structure for resilience to big storms.







Monday, August 13, 2012

Gender training

“Gender equality in Vietnam has always been an important part of policy, with equal rights of women and men enshrined in the first constitution adopted in 1946. But nevertheless, gender awareness and capacity of the implementation and policy-making bodies are still limited. Nowadays it is increasingly understood that the impacts of climate change are likely to have different impacts on women and men. More broadly, it is now recognised that gendered development interventions tend to be more successful than interventions that do not take account of gender differences. Meanwhile, gender equality and women’s empowerment are central to meeting the Millennium Development Goals.
Gender equality also plays an important role in the activities of the GIZ project. For the project to achieve its goal, it is important that a common understanding of gender principles is held during project implementation. To ensure this, a national expert, Mrs. Tran Thu Thuy from the Central Women’s Union, conducted gender training for local authorities, with the aim of strengthening the participants’ knowledge and skills on how to integrate gender aspects into project activities.”
The training was conducted as a dynamic workshop with a participatory approach including games, group work, presentations and a plenary discussion. Workshop regulations required active participation; all ideas to be listened-to and respected; no personal criticism and mobile phones to be in silent mode.
Gender training course notes

Friday, June 29, 2012

ICAM training, June 2012

28-29.06.2012
On June 28th and 29th, 2012, the Department of Agriculture and Rural Development (DARD) of Soc Trang and the Vietnamese-German technical cooperation project ‘Management of Natural Resources in the Coastal Zone of Soc Trang Province’ organised a training on Integrated Coastal Area Management (ICAM) in Soc Trang City for local authorities and relevant stakeholders related to the management of coastal resources and the environment.
The aim of this ICAM training course was to strengthen participants' knowledge and skills for the implementation of an ICAM programme and to provide a better understanding on how the ICAM framework has become a useful methodology to promote sustainable development of coastal areas.
The training was conducted by three national experts, Dr. Nguyen Minh Son,  Mr. Le Van Thu and Mrs. Pham Thi Chin, who have special knowledge of ICAM implementation in Vietnam and are familiar with PEMSEA’s ICM framework and process, as the project wants to cooperate closely with PEMSEA (Partnerships in Environmental Management for the Seas of East Asia) and VASI (Vietnam Administration of Sea and Islands) for the up-scaling of ICAM in Vietnam.
The training course emphasised the need for ICAM, the benefits of an integrated approach to management, the basic principles behind the ICAM practice, the framework, processes and good practices of ICAM implementation. Case studies and lessons learned from the ICAM implementation in Da Nang, Thua Thien Hue and in the region were also presented and discussed. Source: Our Project Website
ICAM Training June 2012 - Course notes

Thursday, April 12, 2012

Quang Binh Study Tour on Green Village Development Planning

 Group photo in front of the cultural house of Cu Lac 2 village
From 9 to 12 April 2012, with the support of GIZ CZM Soc Trang, a group of Soc Trang representatives visited Quang Binh in a study tour to learn more about integrating natural conservation in building participatory economic and social development plan at village, commune and district levels in the buffer zone of Phong Nha-Ke Bang national park. The group had meetings at the GIZ Quang Binh and the Phong Nha-Ke Bang national park offices, listened to their presentations on the project in general and especially on green village development planning (VDP). On April 11, the group also had chances to visit some livelihood models suggested from the VDP and attending a meeting with local people in Cu Lac 2 village, Son Trach commune. The “Conservation and Sustainable Management of Natural Resources in Phong Nha-Ke Bang National Park Area” is an eight year Vietnamese – German cooperation project. Located 500 km away from Hanoi and 50 km from Dong Hoi city, the Phong Nha-Ke Bang national park has been recognized by UNESCO as World Heritage since 2003. The project site comprised of 3 main areas, (1) the core area of 85,754 ha, (2) the extension area of 31,071 ha and (3) the buffer zone of 225,000 ha, embracing 13 communes (7 communes of Bo Trach district; 5 communes of Minh Hoa district and 1 commune of Quang Ninh district) with 155 villages and a population of 60,000 people.
Map of the project area
General goals of the project are integrating sustainable socio-economic development in management and conservation of natural resources and biodiversity of the Phong Nha-Ke Bang national park, reducing pressure on natural resources in the national park area and improving livelihood conditions of local people in the project area. Three key operating areas of the project are (1) protection and management of the national park, (2) development of the buffer zone and (3) sustainable tourism development. In the field of development of the buffer zone, since 2011, two key activities of (1) building conservation-oriented/green village development plans and (2) alternative livelihood models had been conducted with technical support from GIZ Quang Binh.

Green Village Development Planning (VDP)
The buffer zone of the project had faced many challenges. The communities in the buffer zone had high poverty rate with low awareness on natural conservation. Most livelihood activities of local people here were based on exploitation of forest natural resources such as grazing, burn shifting cultivation, reclamation, hunting and trading wildlife, forest wood, minerals. On the other hand, income from tourism had been limited and other alternative livelihoods had not been applied effectively. Though the provincial socio-economic development planning had been implemented, it had not considered yet natural conservation, especially biodiversity conservation and heritage protection in the national park region. The imbalance between economic development and natural conservation in the context of climate change would make the situation worse. Therefore, it is critically essential for the buffer zone to take into account conservation in their socio-economic development planning (conservation-oriented or green development planning).

From January to June 2011, GIZ Quang Binh had supported building 157 green development plans at village level and 13 green development plans at commune level in the buffer zone. One guideline handbook on green development planning at village and commune levels had also been compiled. So far, the green commune development plans of 13 communes in the buffer zone had been approved and these now become important inputs for the 5 year development and investment plan of the buffer zone. Conservation-oriented socio-economic development planning aims to ensure that village, commune and district development plans (VDP, CDP and DDP) do not exacerbate threats to the biological diversity of Phong Nha-Ke Bang national park’s core and buffer zones; any harmful impacts or encroachment to the core zone are prevented. On the other hand, livelihood activities, identified in the VDPs, CDPs and DDPs, which have potential to reduce threats to the biological diversity of Phong Nha-Ke Bang national park are prioritized for investment. Local socio-economic development, in association with poverty reduction and hunger alleviation is improved in a sustainable way. Mutual awareness of both local communities (in terms of Phong Nha-Ke Bang national park’s biodiversity values and conservation management issues) and the national park management board (in terms of local people’s livelihood needs and aspirations) is enhanced. Positive relationship between the national park authorities and local communities is strengthened. Solidarity among local communities is also created. Since it is a process where villagers participate in developing their own village socio-economic development plan, this participatory and bottom-up approach can enhance the implementation of grassroots democracy as well as the effectiveness of investment projects and public services which would be better met with local people’s demands.

The green village development planning is a micro planning process, applying the participatory rural appraisal (PRA) tools and is based on the Decision No. 1309 (2008) of Quang Binh People’s Committee on the participatory socio-economic development planning procedure at commune level in Quang Binh province. Complementary to the Decision No. 1309, the green VDP procedure integrates conservation orientation such as introduction of the national park values, participatory assessment of livelihood impacts, analysis and selecting of livelihoods with conservation-oriented criteria… Main steps of the green VDP procedure applied in Quang Binh are summarized in the following (more details can be read in the guidelines and handbook for Green VDP).  

Step 1 – Preparation This step is very important to provide information, facilities, conditions, guidelines, policies, methods and planning skills as inputs for planners before implementation in the village. Useful information on natural conditions, livelihoods, socio-economy, implemented policies, previous socio-economic development plans, supporting projects… were collected to helps planners image the village situation before developing plan. Necessary stationeries, facilities, documents were also be prepared. High agreement on policies and implementation methods was made with local authorities, departments and unions such as Women Union, Farmers Association. Skills and methods for planning were trained for planners/facilitators. They should have knowledge on ecology, conservation, socio-economy, new agro-forest techniques, sustainable development… in order to support local people in analyzing situation, restoring ecological balance, guiding sustainable development activities, building alternative livelihood models.

 Step 2 – First village meeting In this step, the need, goals and process of participatory conservation-oriented socio-economic development planning were introduced to villagers. Biodiversity and other values of the national park were also introduced to villagers to raise awareness on conservation. A VDP working group was formed. Villagers chose about 15-20 people (at least 30% should be women) who had experience and capacity to give good contributions in the planning process and who represented for different stakeholders such as local authorities, unions, Women Union, Youth Union, ethnic groups…

 Step 3 – Planning meetings In this step, participatory rural appraisal (PRA) tools were used for participatory impact assessments. Current livelihood activities were listed. Those activities threatening conservation were analyzed to be ranked by the levels of impacts and finding solutions for mitigation. Current land use was analyzed through people drawing their own village’s current land use map and ecological cross-section. Through current land use map, the boundary of the national park was identified for people not to encroach. Then, potentials and solutions of alternative livelihood models, vocational training, public services were analyzed, ranked and selected with conservation-oriented criteria. Priority for forestry activities, non-timber forest, industrial crop, cash crop and livestock were identified. Future conservation-oriented land use plan was drafted.

 Flipchart listing of livelihood activities having impacts to conservation and suggested solutions 

 
Two guiding posters on livelihood activities with positive (left) and negative (right) impacts to biodiversity of the Phong Nha-Ke Bang national park on the wall of the Cu Lac 2 village’s cultural house.

 Flipchart describing current ecosystem in Cu Lac 2 village with cross-section through forest, plantation, lakes, garden, rice areas; their current situation, difficulties and suggested solutions.


Matrix of forest and non-timber trees with conservation-oriented criteria for assessment and identifying priority (Cu Lac 2 village)

 Ranking of livelihood, vocational training activities need for supporting (Cu Lac 2 village)

Step 4 – Drafting of the village’s 5 year action plan At this step, results of the planning meetings were synthesized to help villagers and local authorities to see what activities would be conducted, when, how and who would be responsible. Draft of village development plan for 5 year in general and one year in detail was built.  This action plan served as the basis for the project to make more practical and people’s aspiration – based activities to support villagers and the community.

The draft five year action plan for Cu Lac 2 village

Step 5 – Final village meeting The final village meeting aimed to create high agreement through discussion and supplementing the draft version of action plan and future land use that the VDP working group had built. Therefore the more villagers attended the meeting the better. The head of the village presented the draft plan and letting people to contribute their ideas. After the meeting, the conservation-oriented village development plan was completed.  

Step 6 – Building participatory commune socio-economic development planning (CDP) In this step, the conservation-oriented village socio-economic development plans of villages in the commune were synthesized into the commune socio-economic development plan. This commune development plan was then presented to commune local authorities for consultation. A meeting for the commune development plan’s approval was held.  

Step 7 – Integrating CDPs into the district socio-economic planning At this step, the approved commune socio-economic development plans of communes in the district were submitted to the District People’s Committee. They would then be integrated into the socio-economic development planning of the whole district.

 Step 8 – Periodically evaluation meetings Meetings for evaluation of the conservation-oriented socio-economic development planning’s implementation results should be held periodically (6-monthly, yearly).

The project acknowledged some challenges and limitations during deployment of the green VDP process. To conduct participatory planning for 157 villages in the 13 communes, it required quite a big amount of time and work. The participation of ethnic minority women was still limited. Skills training for participating officers as well as raising awareness for stakeholders was also an issue. In addition, some villages were in remote areas which made them not very easy to access. On the other hand, previous and other on-going projects in the area could have impacts to the project as some projects came with many expectations from local people and when these projects ended, people were left with some faith lost. Moreover, it was always a challenge between the project’s limited budget and the development demand of the villages. After completing the village development planning, since October 2011, based on people’s wishes and the priority set, 6 alternative livelihood models of safe vegetables, chicken, VA06 weed, bamboo shoot, improved stove and sweet potato have been developed for 77 chosen households in 5 communes of Bo Trach district. Aim of the activity was job and income generation for local people, hence reducing pressure of natural resource exploitation. These livelihood models received both initial capital by KfW and technical support by GIZ. Local people were also required to contribute some reciprocal capital to ensure their responsibility and commitment.

 On Wednesday April 11, we were divided into 2 groups, each group visited 6 livelihood models in different sites. Group 1 (Mr. Tran Van Ho, Mr. Nguyen Ngoc Vinh, Mr. Pham Huu Lai, Mr. Phan Van Xe, Mrs. Trieu Thy Thanh Thao, Mr. Nguyen Van Ngo, Mr. Pham Van Vung and Ms. Pham Thuy Duong) went to Phu Dinh and Hung Trach communes. Group 2 (Mr. Tran Van Thanh, Mr. Nguyen Van Thu, Mrs. Lam Thi Thanh Diem, Mr. Ngo Dang Son, Mr. Tran Thanh Long, Mr. Le Hoang Nhin, Mrs. Nguyen Thi Phuong and Mr. Ho Thanh Kiet) went to Son Trach, Phuc Trach and Xuan Trach communes.

Safe vegetables model in village 6, Phu Dinh commune


 
 Chicken for meat model in village 6, Phu Dinh commune

 
 
VA06 weed model in Khuong Ha 3 village, Hung Trach commune

 
 
Bamboo shoot model in Khuong Ha 3 village, Hung Trach commune


 

Improved stove model at Mr. Nghien’s house, Khuong Ha 4 village, Hung Trach commune


 

Sweet potato model at Mr. Son’s house, Khuong Ha 5 village, Hung Trach commune

Because they were first pilot models, the lessons learned and experiences can be taken into account for future planning and selection of alternative livelihood models. For example, the improved stove model would not be recommended as it turned out to be quite complicated in operation. Moreover, alternative livelihood models should link to sustainable tourism development to provide more jobs and income for local people as well as to preserve the natural resources. Although conservation activities take time to show their effectiveness, to some extent, this participatory, grass root approach had brought out many benefits to all stakeholders. Local communities’ awareness on biodiversity and natural heritage values of the national park and other conservational issues was enhanced. In addition, through participation in the planning process, people’s roles were empowered; their aspirations were heard and better met.

For the national park, the planning process was a good chance to widely disseminate its conservation message and to consolidate its cooperation relationship with local communities. For local authorities, their socio-economic development planning methodology was improved in a more sustainable way. In general, the conservation-oriented socio-economic development planning in Quang Binh could and should be replicated in other places, particularly where there are conservation issues. In the case of Soc Trang, though natural conditions of the province are different compared to Quang Binh (delta rice field compared to karst and mountains), the mangrove forests along the coastline of Soc Trang are valuable resources that should be conserved and developed. On the other hand, since our project in Soc Trang has already some pilot activities on mangrove co-management, this can be an advantage to integrate the conservation-oriented socio-economic development planning into the co-management processes. If that is the case, more in-depth training on PRA tools and other implementing skills should be organized.



Saturday, January 28, 2012

Ha Tien, Tet 2012

28.01.2012 (Mùng 6 Tết)

We went to Hà Tiên by motorbike, following the shortcut along the South-West border of the Vĩnh Tế channel. It was such a peaceful and enjoyable road!


P1280656
Tịnh Biên - the town at the Cambodian border

Along Vĩnh Tế channel
On the way along Vĩnh Tế channel

P1280672


P1280670


P1280673


P1280675


P1280678


P1280682


P1280685
White cranes

P1280689
Our motorbike

P1280701
The tree in Ha Tien

P1280702
On the way to Ba Hòn, Hà Tiên

P1280715


P1280711

Hải Sơn pagoda ("Cave pagoda" or Chùa Hang)

P1280747


P1280751


P1280761

P1280764
Inside the cave

P1280772


P1280771

P1280768


P1280743


P1280774



P1280776